Planning applications submitted to Malvern Hills District Council from June 3-7 include revised plans for more homes in Tunnel Hills and proposals for holiday lodges in Leigh Sinton.
Maguire Holdings have applied to locate 46 holiday lodges plus accommodation for a manager at land off Lower Howsell Road.
An application for lawful development has been made regarding an extension in Callows Orchard, Rushwick.
Miller Homes want to make changes to plans approved at appeal for 145 homes in Astley.
There are plans to demolish a conservatory and replace it with a two-storey extension in Court Road, Malvern.
The owners of a home in Alicante Close, Malvern, want to build a side extension with a new porch and loft.
Park Farm House in Church Lane, Hallow, has nine timber-framed windows that need replacing.
There’s an application for a garage conversion and extension at a property in Main Road, Hallow.
National Grid wants to replace overhead cables at land next to Top Barn Farm in Holt Heath.
It has also applied to carry out work at Perrins Court in Bromsberrow.
Retrospective permission is being sought for the demolition of a workshop and kennels, and the construction of a new workshop at 6 High Green, Severn Stoke.
There are plans for a side extension and front porch at a property in Abberley.
An application makes amendments to a previous plan for and extension and other works at Walnut Cottage in Cotheridge.
Plans have been submitted for new stables at The Lenches, Rectory Lane, Knightwick.
The owners of Westward House in Hanley Swan want to build an extension to provide a carer’s bedroom.
There are plans to extend a holiday let at Henwick House in Jennett Tree Lane Callow End. And proposals for a new farm building on land off Bush Lane, Callow End.
The council has also received an application about plans for a new farm building in Chimney Park, Eastham.
Also in the Tenbury area, there are plans for a house extension at Coppice House in Eastham, a farm building and farm track at Hursley Farm in Bannals Lane, Stoke Bliss, a double garage at Hillstone in St Marys Close, Tenbury, and a three-bed self-build bungalow in Oldwood Road.
Kendrick Homes, having had plans for 70 homes in Tunnel Hill rejected, have come back with a proposal for 60 properties on the same site.
The owners of Rose Cottage in Newbridge Green want to extend their garage to provide a workshop.
There are plans for a ground floor extension at The Bothy in School Lane, Upton.
And proposals for a new balcony and other works at Coachmans Cottage in Blackheath Way, Malvern.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here